J549 – Update 37

THIS WEEKS ACHIEVEMENTS – week ending 22 September 2023.

Tasks competed this week were:

  • Further hydro testing up to 130psi.. Still a way to go as we have to get to 225psi test pressure.
  • More work by Baz, Harry and assistants in re-beading and re-expanding tubes.
  • The oil tank heat coil was repaired and re-installed.
  • Installation of the regulator assembly which included a lot of adjustments to the mechanism – we now have a lot better operation and fit of all the parts.
  • More undercoating of the engine and tender.

Below are some photos of the regulator installation.

CURRENT PRIORITIES –

  • Hydro static test of boiler to 225psi
  • Seal welding of the new tubes after successful hydrostatic test.
  • Make the covers for the steam delivery pipes.
  • Continue with the tender and cab repainting.